The TNN Development Limited is one of the leading manufacturers and suppliers of main beam positioning welding assembly: solving trailer production challenges in China. Welcome to buy discount main beam positioning welding assembly: solving trailer production challenges made in China here from our factory. Quality products and low price are available.
Main Beam Positioning Welding Assembly
One; Usage purpose and current situation analysis
After the longitudinal beam is welded and enters the weighing assembly stage, most trailer manufacturers do not have specialized auxiliary tools for production. At present, the main production method is still carried out on the ground or on flat plates; Set parallel lines Diagonal and other tasks require manual pry bars to adjust dimensions, making it difficult to grasp the accuracy of another dimension and labor-intensive time-consuming. Effortless
Two; Working principle and brief explanation
Transport (or lift) the longitudinal beams from the previous station to this fixture (platform), position the two longitudinal beams, complete the assembly and welding, and then transport (lift) them to the next station.

On one side of the 'Main Frame Welding Assembly' is; A rigid vertical baffle (platform reference plane) straightened by a straight line, with the other side being; Powered by an oil cylinder, the L-shaped guide square tube (customized) is tightened to meet the welding requirements of the main beam, and the main support is welded.

Detail handling; Due to the different sizes of goose necks in different models, the front goose neck platform is equipped with an overall takeoff and landing function to meet the working needs of different models.

The working position of the equipment is equipped with personnel standing workstations, which greatly improves the mobility and convenience of personnel, indirectly increasing the safety factor in work

Three; Technical parameters and brief configuration
|
1: Main technical parameters |
|||||
|
1 |
Equipment model: PH-ZL-18M |
||||
|
2 |
Equipment Name: Main Beam Positioning Welding Assembly |
||||
|
3 |
Equipment size: 18000mm * 2670mm * 1120mm |
||||
|
4 |
Maximum clamping of equipment: 950mm --1450mm |
||||
|
5 |
System rated pressure: ≤ 15MPs |
||||
|
6 |
Hydraulic oil model: L-HM-46 |
||||
|
7 |
Gooseneck platform lifting height: ≤ 560mm |
||||
|
8 |
Longitudinal beam height: ≤ 560mm |
||||
|
2: Main configuration parameters |
|||||
|
Serial Number |
Component Name |
Specification parameters |
notes |
||
|
1 |
Oil pump type |
gear pump |
certified products |
||
|
2 |
Oil pump displacement |
10 milliliters |
standard |
||
|
3 |
Motor brand |
Shandong Lisheng |
certified products |
||
|
4 |
Motor model |
Y112M-4 |
Copper clad |
||
|
5 |
Whole machine power |
≤5KW |
|||
|
6 |
Model of directional valve |
34SM-L10H-T |
certified products |
||
|
7 |
Oil cylinder model |
HSG63*500 |
|||
|
8 |
Action control mode |
hand movement |
|||
|
9 |
Oil cylinder control mode |
Individual control |
|||
|
10 |
Gooseneck platform lifting device |
075 reduction motor, linkage |
certified products |
||
|
11 |
Platform lifting control |
Electric control, buttons |
certified products |
||
|
3: Safety production protection |
|||||
|
1 |
Hydraulic system overflow valve |
||||
|
4: Power supply range |
|||||
|
1 |
380V±20V 50HZ |
||||
|
5: Warranty period |
|||||
|
1 |
From the delivery date, the entire machine comes with a one-year free warranty. |
||||
|
6: Random data |
|||||
|
1 |
One copy of the equipment circuit diagram |
||||
|
2 |
One copy of after-sales manual |
||||
|
7: Scope of supply, scope of self provided by the demander, and installation conditions of the site |
|||||
|
Scope of Supply: |
|||||
|
Serial Number |
name |
notes |
|||
|
1 |
Gooseneck lifting platform: 1 set |
Includes: 4 sets of elevators, 2 reduction motors, 1 set of platform (length: 4.5 meters, width: 2.7 meters), 4 supporting wheels |
|||
|
2 |
Main platform: 1 set |
Includes: 1 set of platform (length: 13.5 meters, width: 2.3 meters), 12 supporting wheels, and various pivot oil cylinders. |
|||
|
3 |
Hydraulic station: 1 set |
Includes: 1 set of electrical control cabinet |
|||
|
The purchaser shall provide: |
|||||
|
1 |
Hydraulic oil |
L-HM-46 |
|||
|
2 |
power line |
4-core 4-square |
|||
|
Site installation conditions: 1: Concrete floor 2: Ground tilt angle: less than 8 degrees |
|||||
|
Note: The above supply scope includes complete equipment components to ensure normal operation and functioning. |
|||||
Main beam positioning and welding assembly display diagram



Hot Tags: main beam positioning welding assembly: solving trailer production challenges, China main beam positioning welding assembly: solving trailer production challenges manufacturers, suppliers







